''Attendees:
+
''Attendees: David, Beni, John L. (JLab), Will (Chile), GV<sup<2</sup>, Pavlos, Stratos (Athens), Shaun, Zisis (Regina)''
 +
# Announcements: none
 +
# Action Items: Chile responded offline to Elton's request on an update regarding the light guide re-machining.
 +
# Monitoring: Stratos responded offline to Elton's question regarding the FCAL plexiglas sheet specs. G. Vassileiadis will meet with David and mark at JLab on software projects.
 +
# FCAL (John L.): The dark room is at JLab.  Rectangular structure is in place.  Some metal skin has been mounted but mostly awaiting to put cables in first; 4x4 ft^2 skin pieces go on in an hour, using rivets.  Working on dark room sensors (humid., temp., pressure, light) and debugging them.  Labyrinth delivered to IU, awaiting some sheet metal, and will be shipped to JLab late this week or next.  On the JLab website, the FCAL is (finally) shown as completed! (Yippie).
 +
# BCAL
 +
#* Light guide gluing
 +
#* SiPM studies
 +
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2246 Cosmics analysis]
 +
#* Decommissioning of Bcal module factory
 +
# Reconstruction and Simulation
 +
# TDR update
 +
# Calibration of Calorimeters
 +
# Any other business

Revision as of 15:59, 18 June 2013

'Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting(s)

  1. Light guides
    • Shipment of replacement light guides (USM)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Monitoring
  4. FCAL
  5. BCAL
    • Light guide gluing
    • SiPM studies
    • Cosmics analysis
    • Decommissioning of Bcal module factory
  6. Reconstruction and Simulation
  7. TDR update
  8. Calibration of Calorimeters
  9. Any other business

Minutes

Attendees: David, Beni, John L. (JLab), Will (Chile), GV<sup<2</sup>, Pavlos, Stratos (Athens), Shaun, Zisis (Regina)

  1. Announcements: none
  2. Action Items: Chile responded offline to Elton's request on an update regarding the light guide re-machining.
  3. Monitoring: Stratos responded offline to Elton's question regarding the FCAL plexiglas sheet specs. G. Vassileiadis will meet with David and mark at JLab on software projects.
  4. FCAL (John L.): The dark room is at JLab. Rectangular structure is in place. Some metal skin has been mounted but mostly awaiting to put cables in first; 4x4 ft^2 skin pieces go on in an hour, using rivets. Working on dark room sensors (humid., temp., pressure, light) and debugging them. Labyrinth delivered to IU, awaiting some sheet metal, and will be shipped to JLab late this week or next. On the JLab website, the FCAL is (finally) shown as completed! (Yippie).
  5. BCAL
    • Light guide gluing
    • SiPM studies
    • Cosmics analysis
    • Decommissioning of Bcal module factory
  6. Reconstruction and Simulation
  7. TDR update
  8. Calibration of Calorimeters
  9. Any other business