Line 12: | Line 12: | ||
* 3D model - show progress | * 3D model - show progress | ||
* Upcoming run, possible tests [[Media:CPP_Tests.pdf]] | * Upcoming run, possible tests [[Media:CPP_Tests.pdf]] | ||
+ | Assume that nominal the GlueX configuration consists of | ||
+ | * No Pb shielding | ||
+ | * DIRC installed | ||
+ | * Solenoid field at 1350 A | ||
+ | |||
+ | CPP Test Configuration | ||
+ | * With and without Pb shielding | ||
+ | * DIRC removed | ||
+ | * Solenoid field at 1350 A (no change) | ||
+ | |||
+ | o CPP test DAQ setup: 2 hrs | ||
+ | o Repeat measurement with nominal GlueX configuration: 2 hrs | ||
+ | o Configure experiment for CPP Test: 38 hours | ||
+ | - Start with no DIRC, no shielding | ||
+ | o Take data: 2 hours | ||
+ | o Install Pb shielding: 6 hours | ||
+ | o Take data: 2 hours | ||
+ | o Restore nominal GlueX configuration: 26 hours. | ||
+ | |||
+ | Total time = 2 + 2 + 38 + 2 + 6 + 2 + 26 = 76 hours ~ 3 days | ||
+ | |||
* Things to work out | * Things to work out | ||
** Gas line manifold | ** Gas line manifold |
Revision as of 08:52, 18 June 2020
Meeting Time and Place =
Thursday June 18, 2020, 1:30pm Bluejeans https://bluejeans.com/735541157/3638?src=calendarLink
- Present - Elton, Dave, Stephanie, Ilya, Rory (remote)
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_04,_2020_CPP_Design_Meeting
- FY2020 Procurement Priorities Media:CPP_Procurement_Priorities.pdf
- Design/Fab/Install schedule Media:CPP_install_schedule_2021.pdf
- Shielding Simulation - Ilya
- 3D model - show progress
- Upcoming run, possible tests Media:CPP_Tests.pdf
Assume that nominal the GlueX configuration consists of
- No Pb shielding
- DIRC installed
- Solenoid field at 1350 A
CPP Test Configuration
- With and without Pb shielding
- DIRC removed
- Solenoid field at 1350 A (no change)
o CPP test DAQ setup: 2 hrs o Repeat measurement with nominal GlueX configuration: 2 hrs o Configure experiment for CPP Test: 38 hours - Start with no DIRC, no shielding o Take data: 2 hours o Install Pb shielding: 6 hours o Take data: 2 hours o Restore nominal GlueX configuration: 26 hours.
Total time = 2 + 2 + 38 + 2 + 6 + 2 + 26 = 76 hours ~ 3 days
- Things to work out
- Gas line manifold
- Adjustable lead absorber
- Alignment hardware
- Complete structural analysis
- Develop Detailed installation plan
- Develop Design/operational/Maintenance Requirements
Minutes and Action Items
- Reviewed minutes of last meeting
- Set up new meeting in 2 weeks