(Created page with "= Meeting Time and Place == Tuesday June 24, 2022 11am TEDF 2504 and Teams == Agenda == * Safety - lightning strikes * Hall D current Tasks ** FCAL Insert Module fabricati...") |
(→Agenda) |
||
Line 5: | Line 5: | ||
== Agenda == | == Agenda == | ||
− | * Safety - lightning strikes | + | * Safety - lightning strikes https://www.mutual-assurance.com/post/lightning-home-damage |
* Hall D current Tasks | * Hall D current Tasks | ||
** FCAL Insert Module fabrication | ** FCAL Insert Module fabrication | ||
Line 13: | Line 13: | ||
*** Moving tent end of June to EEL 108 (will get 1 weeks notice) | *** Moving tent end of June to EEL 108 (will get 1 weeks notice) | ||
** Tagger NMR issues | ** Tagger NMR issues | ||
− | |||
− | |||
− | |||
* FCAL Insert Drawings - 98% complete | * FCAL Insert Drawings - 98% complete | ||
** need cooling pipe to chiller assy | ** need cooling pipe to chiller assy | ||
Line 21: | Line 18: | ||
** need installation drawing | ** need installation drawing | ||
** Procurement plan developed and started J:\Hall D\FCAL insert | ** Procurement plan developed and started J:\Hall D\FCAL insert | ||
− | * New Profiler install - not until August - new plates arrived need to add this to schedule | + | * New Profiler install - not until August - new plates arrived, need to add this to schedule |
* Controls | * Controls | ||
** FDC chiller cooling water flow - | ** FDC chiller cooling water flow - |
Revision as of 10:58, 23 June 2022
Meeting Time and Place =
Tuesday June 24, 2022 11am TEDF 2504 and Teams
Agenda
- Safety - lightning strikes https://www.mutual-assurance.com/post/lightning-home-damage
- Hall D current Tasks
- FCAL Insert Module fabrication
- 60 brass straps per week needed now?
- matching mu metal to steel shields
- cutting tool
- Moving tent end of June to EEL 108 (will get 1 weeks notice)
- Tagger NMR issues
- FCAL Insert Module fabrication
- FCAL Insert Drawings - 98% complete
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
- need installation drawing
- Procurement plan developed and started J:\Hall D\FCAL insert
- New Profiler install - not until August - new plates arrived, need to add this to schedule
- Controls
- FDC chiller cooling water flow -
- CPP removal/Primex install gant chart O:\halld_engineering\Installation Schedules\MS Projects
- General Maintenance
- On Call - Josh/Stephanie
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- Complete HCO
- Get Keith fully trained on Brass straps
- DIRC water skid start up procedure update
- clean hall!