* Safety -  lightning strikes
+
* Safety -  lightning strikes https://www.mutual-assurance.com/post/lightning-home-damage
 
* Hall D current Tasks  
 
* Hall D current Tasks  
 
** FCAL Insert Module fabrication
 
** FCAL Insert Module fabrication
Line 13: Line 13:
 
*** Moving tent end of June to EEL 108 (will get 1 weeks notice)
 
*** Moving tent end of June to EEL 108 (will get 1 weeks notice)
 
** Tagger NMR issues
 
** Tagger NMR issues
** Downstream vacuum pipe install - complete - turn pump back on in final HCO [[image:Lum_mon.jpg|thumb]]
 
** Add casters to Microscope stand
 
* TEDF work area move in June to test lab high bay or ESB
 
 
* FCAL Insert Drawings - 98% complete
 
* FCAL Insert Drawings - 98% complete
 
** need cooling pipe to chiller assy
 
** need cooling pipe to chiller assy
Line 21: Line 18:
 
** need installation drawing
 
** need installation drawing
 
** Procurement plan developed and started J:\Hall D\FCAL insert
 
** Procurement plan developed and started J:\Hall D\FCAL insert
* New Profiler install - not until August - new plates arrived need to add this to schedule
+
* New Profiler install - not until August - new plates arrivedneed to add this to schedule
 
* Controls
 
* Controls
 
** FDC chiller cooling water flow -  
 
** FDC chiller cooling water flow -  

Revision as of 11:58, 23 June 2022

Meeting Time and Place =

Tuesday June 24, 2022 11am TEDF 2504 and Teams

Agenda

  • Safety - lightning strikes https://www.mutual-assurance.com/post/lightning-home-damage
  • Hall D current Tasks
    • FCAL Insert Module fabrication
      • 60 brass straps per week needed now?
      • matching mu metal to steel shields
      • cutting tool
      • Moving tent end of June to EEL 108 (will get 1 weeks notice)
    • Tagger NMR issues
  • FCAL Insert Drawings - 98% complete
    • need cooling pipe to chiller assy
    • need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
    • need installation drawing
    • Procurement plan developed and started J:\Hall D\FCAL insert
  • New Profiler install - not until August - new plates arrived, need to add this to schedule
  • Controls
    • FDC chiller cooling water flow -
  • CPP removal/Primex install gant chart O:\halld_engineering\Installation Schedules\MS Projects
  • General Maintenance
  • On Call - Josh/Stephanie
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • Complete HCO
  • Get Keith fully trained on Brass straps
  • DIRC water skid start up procedure update