* Safety - lightning strikes https://www.mutual-assurance.com/post/lightning-home-damage | * Safety - lightning strikes https://www.mutual-assurance.com/post/lightning-home-damage | ||
+ | * TDIV/TDV AC update - may reclassify some ACs if primary work is manual labor | ||
* Hall D current Tasks | * Hall D current Tasks | ||
** FCAL Insert Module fabrication | ** FCAL Insert Module fabrication |
Latest revision as of 11:04, 23 June 2022
Meeting Time and Place =
Tuesday June 24, 2022 11am TEDF 2504 and Teams
Agenda
- Safety - lightning strikes https://www.mutual-assurance.com/post/lightning-home-damage
- TDIV/TDV AC update - may reclassify some ACs if primary work is manual labor
- Hall D current Tasks
- FCAL Insert Module fabrication
- 60 brass straps per week needed now?
- matching mu metal to steel shields
- cutting tool
- Moving tent end of June to EEL 108 (will get 1 weeks notice)
- Tagger NMR issues
- FCAL Insert Module fabrication
- FCAL Insert Drawings - 98% complete
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
- need installation drawing
- Procurement plan developed and started J:\Hall D\FCAL insert
- New Profiler install - not until August - new plates arrived, need to add this to schedule
- Controls
- FDC chiller cooling water flow -
- CPP removal/Primex install gant chart O:\halld_engineering\Installation Schedules\MS Projects
- General Maintenance
- On Call - Josh/Stephanie
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- Complete HCO
- Get Keith fully trained on Brass straps
- DIRC water skid start up procedure update
- clean hall!