Agenda
- Safety - lightning strikes
- Hall D current Tasks
- FCAL Insert Module fabrication
- 60 brass straps per week needed now?
- matching mu metal to steel shields
- cutting tool
- Moving tent end of June to EEL 108 (will get 1 weeks notice)
- Tagger NMR issues
- Downstream vacuum pipe install - complete - turn pump back on in final HCO
- Add casters to Microscope stand
- FCAL Insert Module fabrication
- TEDF work area move in June to test lab high bay or ESB
- FCAL Insert Drawings - 98% complete
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
- need installation drawing
- Procurement plan developed and started J:\Hall D\FCAL insert
- New Profiler install - not until August - new plates arrived need to add this to schedule
- Controls
- FDC chiller cooling water flow -
- CPP removal/Primex install gant chart O:\halld_engineering\Installation Schedules\MS Projects
- General Maintenance
- On Call - Josh/Stephanie
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- Complete HCO
- Get Keith fully trained on Brass straps
- DIRC water skid start up procedure update
- clean hall!