Difference between revisions of "June 25, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
(Items for followup from previous meeting(s))
Line 13: Line 13:
 
# Documentation on fiber first-article
 
# Documentation on fiber first-article
 
# Review calibration procedures
 
# Review calibration procedures
 +
# Update cost estimates
 +
#* light guides (USM)
 +
#* temperature stabilization (Tim and Fernando)
 +
#* summing circuits for SiPMs (Fernando)
  
 
= Documents to Review=
 
= Documents to Review=

Revision as of 16:02, 11 June 2009

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
  2. Documentation on fiber first-article
  3. Review calibration procedures
  4. Update cost estimates
    • light guides (USM)
    • temperature stabilization (Tim and Fernando)
    • summing circuits for SiPMs (Fernando)

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL Update
  5. BCAL Fabrication
  6. BCAL Readout
    • Update from USM (Will)
      • Report from Alam/Sergey: Measurements of the effect of cooling on SensL SiPMs
    • VERY Budget comparisons (Elton)
    • Discussion of Bcal Readout Review (July 21)
      • Stefano Miscetti can participate in the review via video. A test of ESNET connection yesterday was very successful.
      • Other reviewers?
      • Agenda
  7. Simulations

Minutes

Attendees: