Difference between revisions of "June 25, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 29: Line 29:
 
# BCAL Fabrication
 
# BCAL Fabrication
 
#* Contract status
 
#* Contract status
#* Construction prototype update  
+
#* [http://www.jlab.org/ccc/mail_archives/HALLD/halld-cal/msg01042.html Construction prototype update]
 
#* Fiber QA: [[Media:AttenLen_JS001-8_Prelim.png]]
 
#* Fiber QA: [[Media:AttenLen_JS001-8_Prelim.png]]
 
#*  [http://www.jlab.org/~semenov/bcal_meeting090611.pdf Fiber measurements] (Andrei)
 
#*  [http://www.jlab.org/~semenov/bcal_meeting090611.pdf Fiber measurements] (Andrei)

Revision as of 14:57, 24 June 2009

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
  2. Documentation on fiber first-article
  3. Review calibration procedures
  4. Update cost estimates
    • light guides (USM)
    • temperature stabilization (Tim and Fernando)
    • summing circuits for SiPMs (Fernando)
  5. Impact of gain variations on resolution (especially for summed SiPMs) (Elton)

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL Update
  5. BCAL Fabrication
  6. BCAL Readout
    • Update from USM (Will)
      • Report from Alam/Sergey: Measurements of the effect of cooling on SensL SiPMs
    • Cost comparisons (Elton)
    • Discussion of Bcal Readout Review (July 21)
      • Stefano Miscetti can participate in the review via video. A test of ESNET connection yesterday was very successful.
      • Other reviewers?
      • Agenda
  7. Simulations

Minutes

Attendees: