Difference between revisions of "June 25, 2009 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 27: | Line 27: | ||
# Calibration | # Calibration | ||
# FCAL Update | # FCAL Update | ||
+ | #* MOU, sow (Elton, Matt) | ||
# BCAL Fabrication | # BCAL Fabrication | ||
#* Contract status | #* Contract status | ||
#* [http://www.jlab.org/ccc/mail_archives/HALLD/halld-cal/msg01042.html Construction prototype update] | #* [http://www.jlab.org/ccc/mail_archives/HALLD/halld-cal/msg01042.html Construction prototype update] | ||
− | #* | + | #* Fibers |
− | + | ||
# BCAL Readout | # BCAL Readout | ||
#* Update from USM (Will) | #* Update from USM (Will) | ||
− | |||
#* Cost comparisons (Elton) | #* Cost comparisons (Elton) | ||
#* Discussion of Bcal Readout Review (July 21) | #* Discussion of Bcal Readout Review (July 21) | ||
Line 40: | Line 39: | ||
#** Other reviewers? | #** Other reviewers? | ||
#** Agenda | #** Agenda | ||
− | # Simulations | + | # Simulations |
− | + | ||
− | + | ||
=Minutes= | =Minutes= | ||
Attendees: | Attendees: |
Revision as of 15:00, 24 June 2009
Teleconference Time: 11:00 a.m. EST
- EVO session
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from previous meeting(s)
- Resolution studies
- Study impact of inactive material at the end of BCAL on acceptance.
- Documentation on fiber first-article
- Review calibration procedures
- Update cost estimates
- light guides (USM)
- temperature stabilization (Tim and Fernando)
- summing circuits for SiPMs (Fernando)
- Impact of gain variations on resolution (especially for summed SiPMs) (Elton)
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration
- FCAL Update
- MOU, sow (Elton, Matt)
- BCAL Fabrication
- Contract status
- Construction prototype update
- Fibers
- BCAL Readout
- Update from USM (Will)
- Cost comparisons (Elton)
- Discussion of Bcal Readout Review (July 21)
- Stefano Miscetti can participate in the review via video. A test of ESNET connection yesterday was very successful.
- Other reviewers?
- Agenda
- Simulations
Minutes
Attendees: