Difference between revisions of "June 25, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 28: Line 28:
 
# FCAL Update
 
# FCAL Update
 
#* MOU, sow (Elton, Matt)
 
#* MOU, sow (Elton, Matt)
 +
# Simulations (Sasha)
 +
#* Backgrounds from Cerenkov light
 +
#* Acceptance loss due to light guides
 
# BCAL Fabrication
 
# BCAL Fabrication
 
#* Contract status
 
#* Contract status
Line 39: Line 42:
 
#** Other reviewers?  
 
#** Other reviewers?  
 
#** Agenda
 
#** Agenda
# Simulations
 
  
 
=Minutes=
 
=Minutes=
  
 
Attendees:
 
Attendees:

Revision as of 17:38, 24 June 2009

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
  2. Documentation on fiber first-article
  3. Review calibration procedures
  4. Update cost estimates
    • light guides (USM)
    • temperature stabilization (Tim and Fernando)
    • summing circuits for SiPMs (Fernando)
  5. Impact of gain variations on resolution (especially for summed SiPMs) (Elton)

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL Update
    • MOU, sow (Elton, Matt)
  5. Simulations (Sasha)
    • Backgrounds from Cerenkov light
    • Acceptance loss due to light guides
  6. BCAL Fabrication
  7. BCAL Readout
    • Update from USM (Will)
    • Cost comparisons (Elton)
    • Discussion of Bcal Readout Review (July 21)
      • Stefano Miscetti can participate in the review via video. A test of ESNET connection yesterday was very successful.
      • Other reviewers?
      • Agenda

Minutes

Attendees: