(Tentative Agenda)
(Tentative Agenda)
Line 40: Line 40:
 
#* Acceptance loss due to light guides  
 
#* Acceptance loss due to light guides  
 
# BCAL Readout
 
# BCAL Readout
#* Update from USM (Will)
+
## Update from USM (Will)
#* Cost comparisons (Elton)
+
## Cost comparisons (Elton)
#* Discussion of Bcal Readout Review (July 21)
+
## Discussion of Bcal Readout Review (July 21)
#** Stefano Miscetti can participate in the review via video. A test of ESNET connection yesterday was very successful.
+
### Stefano Miscetti can participate in the review via video. A test of ESNET connection yesterday was very successful.
#** Other reviewers?  
+
### Other reviewers? (Stepan Stepanyan and Howard Fenker ?)
#** Agenda
+
### Tentative AgendaTopics
 +
#### Status/overview of Bcal construction, geometry - Eugene/George/Zisis
 +
#### Calorimeter requirements and resolution - Elton
 +
####* readout specifications
 +
####* number of p.e.
 +
####* light collection
 +
####* dark rate
 +
####* dynamic range
 +
####* gain
 +
####* calibration
 +
#### Status of sensor development (Carl)
 +
####* SensL SiPM
 +
####* Hamamatsu SiPM
 +
####* Fine mesh PMTs
 +
#### Electrical requirements - Fernando
 +
####* readout granularity
 +
####* discrimination
 +
####* FADCs, TDCs
 +
#### Simulations - Sasha
 +
####* Backgrounds
 +
####* Acceptance gap bcal-fcal
 +
####* gain stabilization / cooling
 +
#### Infrastructure/production at USM? - Will
 +
#### Cost and Schedule - Eugene/Elton
  
 
=Minutes=
 
=Minutes=
  
 
Attendees:
 
Attendees:

Revision as of 10:27, 25 June 2009

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
  2. Documentation on fiber first-article
  3. Review calibration procedures
  4. Update cost estimates
    • light guides (USM)
    • temperature stabilization (Tim and Fernando)
    • summing circuits for SiPMs (Fernando)
  5. Impact of gain variations on resolution (especially for summed SiPMs) (Elton)

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration (George Voulgaris): Summary
  4. BCAL Fabrication (Zisis)
  5. FCAL Update
    • MOU, sow (Elton, Matt)
  6. Simulations (Sasha)
    • Backgrounds from Cerenkov light
    • Acceptance loss due to light guides
  7. BCAL Readout
    1. Update from USM (Will)
    2. Cost comparisons (Elton)
    3. Discussion of Bcal Readout Review (July 21)
      1. Stefano Miscetti can participate in the review via video. A test of ESNET connection yesterday was very successful.
      2. Other reviewers? (Stepan Stepanyan and Howard Fenker ?)
      3. Tentative AgendaTopics
        1. Status/overview of Bcal construction, geometry - Eugene/George/Zisis
        2. Calorimeter requirements and resolution - Elton
          • readout specifications
          • number of p.e.
          • light collection
          • dark rate
          • dynamic range
          • gain
          • calibration
        3. Status of sensor development (Carl)
          • SensL SiPM
          • Hamamatsu SiPM
          • Fine mesh PMTs
        4. Electrical requirements - Fernando
          • readout granularity
          • discrimination
          • FADCs, TDCs
        5. Simulations - Sasha
          • Backgrounds
          • Acceptance gap bcal-fcal
          • gain stabilization / cooling
        6. Infrastructure/production at USM? - Will
        7. Cost and Schedule - Eugene/Elton

Minutes

Attendees: