Difference between revisions of "June 25, 2013 Solenoid Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 9: Line 9:
 
* Status of Action Items
 
* Status of Action Items
 
# Release 140A procedure (Rev C) - George  [[Media:140A Rev C.pdf]] complete
 
# Release 140A procedure (Rev C) - George  [[Media:140A Rev C.pdf]] complete
# Update hardware QD with new 10 turn pot and PLC with inductance algorithm - Elliot  
+
# Update hardware QD with new 10 turn pot and PLC with inductance algorithm - Elliot In work
# Clean up refrigerator and get ready for cooldown - Jonathan
+
# Clean up refrigerator and get ready for cooldown - Jonathan - In work
# Finalize write up of quench analysis, dump resistor and max current rationale  - George  
+
# Finalize write up of quench analysis, dump resistor and max current rationale  - George In work
# Continue low current ramp tests to categorize voltage spikes  - Giles
+
# Continue low current ramp tests to categorize voltage spikes  - Giles - In work
# Write up high current portion of procedure (Rev D) - George [[Media:High Current Rev D.pdf]]
+
# Write up high current portion of procedure (Rev D) - George [[Media:High Current Rev D.pdf]]1st cut out
# Balance Power supply for 25H (if necessary based on 140A tests)- Giles
+
# Balance Power supply for 25H (if necessary based on 140A tests)- Giles In work- Parts received from Danfysik
# Calculate what current we can safely run at at 5K  0.9K margin. [[Media:5K Quench Margins.pdf]]
+
# Calculate what current we can safely run at at 5K  0.9K margin. [[Media:5K Quench Margins.pdf]] Complete
# Set up meeting with Patrizia Tuesday for cooldown decision.
+
# Set up meeting with Patrizia Tuesday for cooldown decision. Complete
 
* Are we ready to start cooldown?
 
* Are we ready to start cooldown?
  

Revision as of 11:13, 26 June 2013

Thursday June 25,2013 at 11am At Jefferson Lab, the meeting will be held in room TED 2504

Attendees

C. Rode, T. Whitlatch, E. Wolin, B. Flora (via Skype), E. Chudakov, J. Creel, G. Young, P. Ghoshal, George Biallas, Bill Schneider, Javier Gomez

Agenda

  1. Release 140A procedure (Rev C) - George Media:140A Rev C.pdf complete
  2. Update hardware QD with new 10 turn pot and PLC with inductance algorithm - Elliot In work
  3. Clean up refrigerator and get ready for cooldown - Jonathan - In work
  4. Finalize write up of quench analysis, dump resistor and max current rationale - George In work
  5. Continue low current ramp tests to categorize voltage spikes - Giles - In work
  6. Write up high current portion of procedure (Rev D) - George Media:High Current Rev D.pdf1st cut out
  7. Balance Power supply for 25H (if necessary based on 140A tests)- Giles In work- Parts received from Danfysik
  8. Calculate what current we can safely run at at 5K 0.9K margin. Media:5K Quench Margins.pdf Complete
  9. Set up meeting with Patrizia Tuesday for cooldown decision. Complete
  • Are we ready to start cooldown?

Useful Info

  • Documents available at M:\halld_engineering\Solenoid\Commissioning\Response to Quench

Meeting Minutes

New Action Items

Path Forward

  1. Complete the 140A procedure including the quench balance and turn to turn short check not completed in the 15A test (to be completed and signed off by June 24) Complete
  2. Continue repair of refrigerator (to be completed by June 25)
  3. Update preliminary analysis of quench and rationale for dump resistor and max current (June 25)
  4. Initial review of updated write up by Bill Schneider and Bob Flora (June 26)
  5. Start refridge cooldown (to be started June 26th if agreed upon)
  6. Complete and sign off maximum current plan and quench analysis(to be completed by June 29)
  7. Start cooling magnet - July 8
  8. Perform 140A testing ( to be completed by July 21)
  9. Perform High current commissioning ( to be completed by July 23)
  10. Map magnet (to be completed by July 28)