(Agenda)
Line 25: Line 25:
 
#** Water testing results
 
#** Water testing results
 
#* Plans for remaining work for installation
 
#* Plans for remaining work for installation
 +
#** [https://logbooks.jlab.org/entry/3693215 Cleaning mirrors]
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
#* Reconstruction with FastDIRC (Yunjie)
 
#* Reconstruction with FastDIRC (Yunjie)

Revision as of 08:10, 25 June 2019

Meeting Information

GlueX DIRC Meeting
Tuesday June 25, 2019
1:00 pm, EDT
JLab Hall D

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Summer installation work:
    • Corrosion with optical box materials and removal
      • Steel alignment pins
      • Aluminum optical fiber brackets
      • LED fiber testing
      • Water testing results
    • Plans for remaining work for installation
  3. Spring 2019 DIRC Commissioning Analysis (All)
    • Reconstruction with FastDIRC (Yunjie)
    • LUT improvements (Roman)
    • Commissioning analyses (Ahmed)
  4. Software/simulations
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  5. Software overview and tasks (All)
  6. AOB