Difference between revisions of "June 28, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(6 intermediate revisions by the same user not shown)
Line 19: Line 19:
 
#* [https://halldweb.jlab.org/wiki/images/2/22/GlueX-II_ERR_Closeout_report.pdf Preliminary ERR Report]
 
#* [https://halldweb.jlab.org/wiki/images/2/22/GlueX-II_ERR_Closeout_report.pdf Preliminary ERR Report]
 
#* [[Addressing ERR review recommendations]]
 
#* [[Addressing ERR review recommendations]]
 +
#** Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed by August 20 (close of Hall D for beam)
 
# Bar box transportation and installation: plans for a writeup? (Matt, et al.)
 
# Bar box transportation and installation: plans for a writeup? (Matt, et al.)
 
# Optical box
 
# Optical box
 
#* Water quality plan (Tim, et al.)
 
#* Water quality plan (Tim, et al.)
#* Status update (Ernie and Jason)
+
#* Controls (from review):
#** Box production at Lesker
+
#** Additional sensor to detect possible water leak on bottom of optical box?
 +
#** Documentation of controls and interlocks
 +
#* Fabrication status update (Ernie and Jason)
 +
#** Box production at Lesker: delivery date to Bates?
 
#** PMT test fixture and cookies ([https://gluexdirc.mit.edu/red-bracket-tests-5 Maria])
 
#** PMT test fixture and cookies ([https://gluexdirc.mit.edu/red-bracket-tests-5 Maria])
 
#** Window procurement
 
#** Window procurement
 
#** Dark box design
 
#** Dark box design
#*** Air flow considerations and plan
+
#*** Air flow considerations and plan:
 +
#**** The power dissipated by each module is ~4 Watts, so the total in one optical box enclosure would be ~144 W.
 +
#**** Temperature and flow rate requirements?
 
#* [[Media:DIRC_INSTALL_SCHEDULEv2.pdf|DIRC installation schedule]]
 
#* [[Media:DIRC_INSTALL_SCHEDULEv2.pdf|DIRC installation schedule]]
 
#* [[Media:DIRC_BBox_Flange_seal.jpg|DIRC BBox Split Flange Seal]]
 
#* [[Media:DIRC_BBox_Flange_seal.jpg|DIRC BBox Split Flange Seal]]
Line 33: Line 39:
 
# MAPMT testing (Bill)
 
# MAPMT testing (Bill)
 
#* Magnetic field test
 
#* Magnetic field test
 +
# [[Fall 2018 DIRC Commissioning|Commissioning plans]]
 
# AOB
 
# AOB

Latest revision as of 09:48, 28 June 2018

Meeting Information

GlueX DIRC Meeting
Thursday June 28, 2018
10:00 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Bar box transportation and installation: plans for a writeup? (Matt, et al.)
  3. Optical box
    • Water quality plan (Tim, et al.)
    • Controls (from review):
      • Additional sensor to detect possible water leak on bottom of optical box?
      • Documentation of controls and interlocks
    • Fabrication status update (Ernie and Jason)
      • Box production at Lesker: delivery date to Bates?
      • PMT test fixture and cookies (Maria)
      • Window procurement
      • Dark box design
        • Air flow considerations and plan:
          • The power dissipated by each module is ~4 Watts, so the total in one optical box enclosure would be ~144 W.
          • Temperature and flow rate requirements?
    • DIRC installation schedule
    • DIRC BBox Split Flange Seal
  4. Simulation studies (Maria and Roman)
  5. MAPMT testing (Bill)
    • Magnetic field test
  6. Commissioning plans