Difference between revisions of "June 28, 2018 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 29: | Line 29: | ||
#*** Air flow considerations and plan | #*** Air flow considerations and plan | ||
#* [[Media:DIRC_INSTALL_SCHEDULEv2.pdf|DIRC installation schedule]] | #* [[Media:DIRC_INSTALL_SCHEDULEv2.pdf|DIRC installation schedule]] | ||
+ | #* [[Media:DIRC_BBox_Flange_seal.pdf|DIRC BBox Split Flange Seal]] | ||
# Simulation studies (Maria and Roman) | # Simulation studies (Maria and Roman) | ||
# MAPMT testing (Bill) | # MAPMT testing (Bill) | ||
#* Magnetic field test | #* Magnetic field test | ||
# AOB | # AOB |
Revision as of 09:36, 27 June 2018
Meeting Information
GlueX DIRC Meeting
Thursday June 28, 2018
10:00 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Bar box transportation and installation: plans for a writeup? (Matt, et al.)
- Optical box
- Water quality plan (Tim, et al.)
- Status update (Ernie and Jason)
- Box production at Lesker
- PMT test fixture and cookies (Maria)
- Window procurement
- Dark box design
- Air flow considerations and plan
- DIRC installation schedule
- DIRC BBox Split Flange Seal
- Simulation studies (Maria and Roman)
- MAPMT testing (Bill)
- Magnetic field test
- AOB