(Minutes)
(Minutes)
Line 35: Line 35:
 
#* New grad student on prototype work (grad student in fall) - will be in charge of building prototype. John is working on a revision of the design (PrimeX model).  Cost accounting for cell wall material is much cheaper with this design, but savings will go to labor and outsourcing.  Overall cost savings are expected.
 
#* New grad student on prototype work (grad student in fall) - will be in charge of building prototype. John is working on a revision of the design (PrimeX model).  Cost accounting for cell wall material is much cheaper with this design, but savings will go to labor and outsourcing.  Overall cost savings are expected.
 
# BCAL
 
# BCAL
#* Absolute fiber light output:  
+
#* Absolute fiber light output: work in progress at Regina.
 
#* Beni: one month before result come out.
 
#* Beni: one month before result come out.
 
#* Regina:very soon using green fiber, laser, calibrated photodiode, 1x1 and 3x3mm^2 fibers.
 
#* Regina:very soon using green fiber, laser, calibrated photodiode, 1x1 and 3x3mm^2 fibers.
Line 41: Line 41:
 
# Lehman Preparations
 
# Lehman Preparations
 
# Alternative readout
 
# Alternative readout
#* Regina will work out more concrete numbers for fiber-to-fiber readout going to 3x3mm^2.
+
#* Elton posted information on Wiki. Discussion on outer and inner layers (coarser readout? wire mesh PMTs?).  Cost vs performance. Impact on material budget. Discussion on updating the reconstruction code by mid July for different readout segmentation (Matt will coordinate with Blake).  Regina to summarize GlueX-doc-659.  Elton has lost enthusiasm for Planacons (low gain, reliability, etc...).
#* Elton: posted information on Wiki; discussion on outer and inner layers (coarser readout? wire mesh PMTs?).  Cost vs performance. Impact on material budget. Discussion on updating the reconstruction code by mid July for different readout segmentation (Matt will coordinate with Blake).  Regina to summarize GlueX-doc-659.  Elton has lost enthusiasm for Planacons (low gain, reliability, etc...).
+
 
# Detailed plans for construction
 
# Detailed plans for construction
#* Module and crate weights estimated.  Ross Industrial in Regina may be able to machine ends as well as sides.  They can handle 4 modules at a time off a flat bed truck.  Next: work with shipping companies and get customs info.
+
#* Module and crate weights estimated.  Ross Industrial in Regina may be able to machine ends as well as sides.  They can handle 4 modules at a time off a flat bed truck.  Next: work with shipping companies and get customs info.  Pull together detailed construction schedule.
 
# Next meeting: June 23.
 
# Next meeting: June 23.

Revision as of 12:05, 9 June 2008

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: May 27, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

Agenda

  1. Updates
    • Calibration system update
    • FCAL
    • BCAL
      • Absolute light output of fibers
  2. Preparations for Lehman Review
  3. Review of Action-Item Tracker for Calorimetry
  4. Any other business

Minutes

Participants: ???, Elton, Beni, Elke, Matt, Zisis, Andrei, George

  1. Calibration System (no update)
  2. FCAL:
    • Flash ADC simulation - in progress, report soon. (Pulsed detection and resolution).
    • New grad student on prototype work (grad student in fall) - will be in charge of building prototype. John is working on a revision of the design (PrimeX model). Cost accounting for cell wall material is much cheaper with this design, but savings will go to labor and outsourcing. Overall cost savings are expected.
  3. BCAL
    • Absolute fiber light output: work in progress at Regina.
    • Beni: one month before result come out.
    • Regina:very soon using green fiber, laser, calibrated photodiode, 1x1 and 3x3mm^2 fibers.
    • SiPMPlus on green fibers with Winston Cone and EMI green PMT on other side. Trigger slightly different than past to give clean tracks. Report will follow in a few days and it will be discussed .
  4. Lehman Preparations
  5. Alternative readout
    • Elton posted information on Wiki. Discussion on outer and inner layers (coarser readout? wire mesh PMTs?). Cost vs performance. Impact on material budget. Discussion on updating the reconstruction code by mid July for different readout segmentation (Matt will coordinate with Blake). Regina to summarize GlueX-doc-659. Elton has lost enthusiasm for Planacons (low gain, reliability, etc...).
  6. Detailed plans for construction
    • Module and crate weights estimated. Ross Industrial in Regina may be able to machine ends as well as sides. They can handle 4 modules at a time off a flat bed truck. Next: work with shipping companies and get customs info. Pull together detailed construction schedule.
  7. Next meeting: June 23.