(Created page with "* December 7, 2016 10-11 AM The tentative agenda is 1) Our schedule for the proposal (back in time): - We may expect that PAC will...")
 
(Replaced content with "* December 7th, 2016")
Line 1: Line 1:
* [[KL Proposal Meeting, December 7, 2016|December 7, 2016]] 10-11 AM
+
* [[December 7th, 2016]]
 
+
The tentative agenda is
+
 
+
1) Our schedule for the proposal (back in time):
+
 
+
- We may expect that PAC will be scheduled for July.
+
 
+
- We have to submit our proposal 6 weeks in advance (May-June).
+
 
+
- It will probably take 4 weeks for the GlueX Collaboration to review (April-May).
+
 
+
- In March, we plan to ask Rolf for a technical review (Jim Napolitano's suggestion).
+
 
+
- GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL.
+
 
+
2) We have to make a conceptual design of the KL project which allows to estimate a cost of the KL (Jim Napolitano's suggestion).  To do that we have to draw a Note and then ask Eugene to ask Tim to make it.
+
 
+
3) Put the right LH2 target and beamline into GlueX MC.
+
 
+
4) Simulate a few K0-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc.
+
Simulate the interactions of the K0 and n in the material of the GlueX setup.
+
 
+
-- ds/dO for KLp-->K+n (Mikhail).
+
 
+
-- ds/dO and Sigma for KLp-->K+Xi (Nick).
+
 
+
-- ds/dO for xxx ?
+
 
+
5) Simulate the n-interaction in the LH2 target with the neutron flux will be reasonable.
+
 
+
6) Calculate the spectrum (p,theta) of the K0 and n coming from the Be target.
+
 
+
7) Status of neutron background simulations (Igor).
+
 
+
8) Schedule for the next meeting.
+
 
+
9) etc.
+