Difference between revisions of "KL Minutes 2016"

From GlueXWiki
Jump to: navigation, search
(Replaced content with "=== All meetings in 2016 === * December 7th, 2016")
Line 2: Line 2:
  
 
* [[December 7th, 2016]]
 
* [[December 7th, 2016]]
 
The Agenda [attended 16 people: Moskov, Avetik, Chen, Franz, Justin, Lei, Mikhail, Nick, Paul, Volker, Kijun, Simon, Igor and three more people via phone]:
 
 
1) Our schedule for the proposal (back in time):
 
 
- We may expect that PAC will be scheduled for July.
 
 
- We have to submit our proposal 6 weeks in advance (May-June).
 
 
- It will probably take 4 weeks for the GlueX Collaboration to review (April-May).
 
 
- In March, we plan to ask Rolf for a technical review (Jim Napolitano's suggestion).
 
 
- GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL.
 
 
2) We have to make a conceptual design of the KL project which allows to estimate a cost of the KL (Jim Napolitano's suggestion).  To do that we have to draw a Note and then ask Eugene to ask Tim to make it.
 
 
3) Put the right LH2 target and beamline into GlueX MC.
 
 
4) Simulate a few KL-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc.
 
Simulate the interactions of the KL and n in the material of the GlueX setup.
 
 
5) Calculate the spectrum (p,theta) of the KL and n coming from the Be target.
 
 
6) For hyperon spectroscopy
 
 
-- ds/dO for KLp-->K+n (Mikhail).
 
 
-- ds/dO for KLp-->KSp (Mikhail).
 
 
-- ds/dO and Sigma for KLp-->K+Xi (Nick).
 
 
-- ds/dO for xxx ?
 
 
7) For meson spectroscopy (Volker).
 
 
8) CP-violation (Moskov)
 
 
9) Status of neutron background simulations (Igor) [[https://halldweb.jlab.org/wiki/images/6/68/KL.pdf]]
 
 
10) Simulate the n-interaction in the LH2 target with the neutron flux will be reasonable.
 
 
11) Schedule for the next meeting - in a month (January 4th, 2017)
 

Revision as of 18:22, 7 December 2016

All meetings in 2016