Difference between revisions of "Level-3 Trigger Strategy"

From GlueXWiki
Jump to: navigation, search
(Created page with "__TOC__ This page will collect the current planned running times/intensities for GlueX and the expected event rates. Based on this a set of requirements can be collected for t...")
 
Line 3: Line 3:
 
This page will collect the current planned running times/intensities for GlueX and the expected event rates.  Based on this a set of requirements can be collected for the Level-3 trigger to document the strategy for implementation
 
This page will collect the current planned running times/intensities for GlueX and the expected event rates.  Based on this a set of requirements can be collected for the Level-3 trigger to document the strategy for implementation
  
== Planned Phases of GlueX Running ==
+
== Approved GlueX Running Time==
  
 
{| class="wikitable"
 
{| class="wikitable"
 
|-
 
|-
! Header text !! Header text !! Header text
+
! !! Phase I !! Phase II !! Phase III !! Phase IV
 
|-
 
|-
| Example || Example || Example
+
| PAC days || Example || Example
 
|-
 
|-
| Example || Example || Example
+
| Minimum electron energy (GeV) || Example || Example
 
|-
 
|-
| Example || Example || Example
+
| Photon flux in coherent peak (photon/s) || Example || Example
 +
|-
 +
| Level-1 trigger rate (kHz)
 
|}
 
|}

Revision as of 09:13, 19 August 2013

This page will collect the current planned running times/intensities for GlueX and the expected event rates. Based on this a set of requirements can be collected for the Level-3 trigger to document the strategy for implementation

Approved GlueX Running Time

Phase I Phase II Phase III Phase IV
PAC days Example Example
Minimum electron energy (GeV) Example Example
Photon flux in coherent peak (photon/s) Example Example
Level-1 trigger rate (kHz)