Difference between revisions of "Level-3 Trigger Strategy"

From GlueXWiki
Jump to: navigation, search
Line 9: Line 9:
 
!  !! Phase I !! Phase II !! Phase III !! Phase IV  
 
!  !! Phase I !! Phase II !! Phase III !! Phase IV  
 
|-
 
|-
| PAC days || Example || Example
+
| PAC days || 30 || 30 || 60 || 200
 
|-
 
|-
| Minimum electron energy (GeV) || Example || Example
+
| Minimum electron energy (GeV) || 10 || 11 || 12 || 12
 
|-
 
|-
| Photon flux in coherent peak (photon/s) || Example || Example
+
| Photon flux in coherent peak (photon/s) || <math>10^6</math> || <math>10^7</math> || <math>10^7</math> || <math>5 \times 10^7</math>
 
|-
 
|-
| Level-1 trigger rate (kHz)
+
| Level-1 trigger rate (kHz) || 2 || 20 || 20 || 200
 
|}
 
|}

Revision as of 09:15, 19 August 2013

This page will collect the current planned running times/intensities for GlueX and the expected event rates. Based on this a set of requirements can be collected for the Level-3 trigger to document the strategy for implementation

Approved GlueX Running Time

Phase I Phase II Phase III Phase IV
PAC days 30 30 60 200
Minimum electron energy (GeV) 10 11 12 12
Photon flux in coherent peak (photon/s) 10^{6} 10^{7} 10^{7} 5\times 10^{7}
Level-1 trigger rate (kHz) 2 20 20 200