Difference between revisions of "Level-3 Trigger Strategy"

From GlueXWiki
Jump to: navigation, search
Line 3: Line 3:
 
This page will collect the current planned running times/intensities for GlueX and the expected event rates.  Based on this a set of requirements can be collected for the Level-3 trigger to document the strategy for implementation
 
This page will collect the current planned running times/intensities for GlueX and the expected event rates.  Based on this a set of requirements can be collected for the Level-3 trigger to document the strategy for implementation
  
== Approved GlueX Running Time (from [[http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2201 PAC 40 Proposal]])==
+
== Approved GlueX Running Time (from [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2201 PAC 40 Proposal])==
  
 
{| class="wikitable"
 
{| class="wikitable"

Revision as of 09:21, 19 August 2013

This page will collect the current planned running times/intensities for GlueX and the expected event rates. Based on this a set of requirements can be collected for the Level-3 trigger to document the strategy for implementation

Approved GlueX Running Time (from PAC 40 Proposal)

Phase I Phase II Phase III Phase IV
PAC days 30 30 60 200
Minimum electron energy (GeV) 10 11 12 12
Photon flux in coherent peak (photon/s) 10^{6} 10^{7} 10^{7} 5x10^{7}
Level-1 trigger rate (kHz) 2 20 20 200