Difference between revisions of "Level-3 Trigger Strategy"

From GlueXWiki
Jump to: navigation, search
Line 9: Line 9:
 
!  !! Phase I !! Phase II !! Phase III !! Phase IV !! Maximum Intensity
 
!  !! Phase I !! Phase II !! Phase III !! Phase IV !! Maximum Intensity
 
|-
 
|-
| Approved PAC days || 30 || 30 || 60 || 200 || X
+
| Approved PAC days || 30 || 30 || 60 || 200 || 0
 
|-
 
|-
 
| Minimum electron energy (GeV) || 10 || 11 || 12 || 12 || 12
 
| Minimum electron energy (GeV) || 10 || 11 || 12 || 12 || 12

Revision as of 09:34, 19 August 2013

This page will collect the currently planned running times/intensities for GlueX and the expected event rates. A set of requirements for the Level-3 trigger can be collected based on this information to document the design and implementation strategy.

Planned GlueX Running (from PAC 40 Proposal)

Phase I Phase II Phase III Phase IV Maximum Intensity
Approved PAC days 30 30 60 200 0
Minimum electron energy (GeV) 10 11 12 12 12
Photon flux in coherent peak (photon/s) 10^{6} 10^{7} 10^{7} 5x10^{7} 10^{8}
Expected total hadronic event rate (kHz)  ??  ?? 36 180 360
Expected hadronic event rate in coherent peak (kHz)  ??  ?? 0.8 8 16
Level-1 trigger rate (kHz) 2 20 20 100 200