Level-3 Trigger Strategy

From GlueXWiki
Revision as of 09:34, 19 August 2013 by Jrsteven (Talk | contribs)

Jump to: navigation, search

This page will collect the currently planned running times/intensities for GlueX and the expected event rates. A set of requirements for the Level-3 trigger can be collected based on this information to document the design and implementation strategy.

Planned GlueX Running (from PAC 40 Proposal)

Phase I Phase II Phase III Phase IV Maximum Intensity
Approved PAC days 30 30 60 200 X
Minimum electron energy (GeV) 10 11 12 12 12
Photon flux in coherent peak (photon/s) 10^{6} 10^{7} 10^{7} 5x10^{7} 10^{8}
Expected total hadronic event rate (kHz)  ??  ?? 36 180 360
Expected hadronic event rate in coherent peak (kHz)  ??  ?? 0.8 8 16
Level-1 trigger rate (kHz) 2 20 20 100 200