Level-3 Trigger Strategy

From GlueXWiki
Revision as of 09:53, 19 August 2013 by Jrsteven (Talk | contribs)

Jump to: navigation, search

This page will collect the currently planned running times/intensities for GlueX and the expected event rates. A set of requirements for the Level-3 trigger can be collected based on this information to document the design and implementation strategy.

Phase IV Planning

This is the first phase of GlueX running where the Level-3 trigger is required to reduce the even rate beyond the reduction provided in hardware by the Level-1 trigger. The nominal photon flux in the coherent peak (8.4-9 GeV) for this phase is 5x10^{7}, which is expected to result in a Level-1 trigger rate of around 100 kHz based previous studies. Based on the event size and DAQ bandwidth expectations in Table 2 (below), the event rate to tape is limited to 20 kHz. Therefore, the nominal goal of the Level-3 trigger in Phase IV is to reduce the Level-1 trigger rate by a factor of 5.


Assumptions for Level-3 Trigger Planning

Some assumptions are necessary to plan for the requirements of the Level-3 trigger based on the expected running conditions of the experiment. Below are two tables with some assumptions for the data taking conditions for the GlueX experiment.

Table 1: Planned GlueX Running Periods (from PAC 40 Proposal)
Phase I Phase II Phase III Phase IV Maximum Intensity
Approved PAC days 30 30 60 200 0
Minimum electron energy (GeV) 10 11 12 12 12
Photon flux in coherent peak (photon/s) 10^{6} 10^{7} 10^{7} 5x10^{7} 10^{8}
Expected total hadronic event rate (kHz)  ??  ?? 36 180 360
Expected hadronic event rate in coherent peak (kHz)  ??  ?? 0.8 8 16
Level-1 trigger rate (kHz) 2 20 20 100 200


Table 2: Data rate assumptions for GlueX
Event size 15 kB
DAQ Bandwidth to tape 300 MB/s