# Spike at BCAL z=220 cm, due to noise [Karthik]
 
# Spike at BCAL z=220 cm, due to noise [Karthik]
 
# Neutrons: revisit past work and move forward; could look at neutron efficiency in hyperon channels, etc. [Tegan et al.]
 
# Neutrons: revisit past work and move forward; could look at neutron efficiency in hyperon channels, etc. [Tegan et al.]
# BCAL hot channels.  Investigate and see if baseline or other improvements are possible.
+
# BCAL hot channels.  Investigate and see if baseline or other improvements are possible during the shutdown (before CPP).
# FCAL calibration.  Investigate whether the HV in some channels needs to be lowered to 1V.
+
# FCAL calibration.  Investigate whether the HV in some channels needs to be lowered to 1V during the shutdown (before CPP).

Revision as of 17:44, 19 November 2021

  1. FCAL: It has been noticed that the pi0 mass shifts when the LED pulser runs at high rate. This is still not understood. See Log Entry 3595928 and references. Several runs have been taken in raw mode. These runs exhibit the shift in pi0 mass with LED running at 1 kHz. There is a need to analyze these to try to determine the cause. [Susan]
    1. 50634 - FCAL Green LED: 1kHz, 29 V, Livetime is 9%, 1.7 M events
    2. 50635 - FCAL Violet LED: 1kHz, 22 V, Livetime is 9%, 1.4 M events
    3. 50636 - FCAL Blue LED: 1kHz, 15 V, Livetime is 9%, 1.5 M events
  2. Hadronic split off studies (work started for FCAL and FCAL-II in the JEF experiment)
  3. Covariance matrices for photons; need pull distributions (Regina could help); add these to best practices page [Mark]
  4. Spike at BCAL z=220 cm, due to noise [Karthik]
  5. Neutrons: revisit past work and move forward; could look at neutron efficiency in hyperon channels, etc. [Tegan et al.]
  6. BCAL hot channels. Investigate and see if baseline or other improvements are possible during the shutdown (before CPP).
  7. FCAL calibration. Investigate whether the HV in some channels needs to be lowered to 1V during the shutdown (before CPP).