Difference between revisions of "MIT/FutureGrid Data Challenge 2 Production"

From GlueXWiki
Jump to: navigation, search
Line 3: Line 3:
 
== Resources ==
 
== Resources ==
 
* [[ Openstack_at_MIT_Overview | MIT Reuse Cluster ]] providing 17 blades x 8 = 136 cores currently.
 
* [[ Openstack_at_MIT_Overview | MIT Reuse Cluster ]] providing 17 blades x 8 = 136 cores currently.
* [https://www.futuregrid.org FutureGrid] project currently providing us with ~180 cores at various sites:
+
* [https://www.futuregrid.org FutureGrid] project currently providing us with ~200 cores at various sites:
 
** University of Chicago
 
** University of Chicago
 
** Indiana University
 
** Indiana University

Revision as of 11:30, 4 April 2014

Resources

  • MIT Reuse Cluster providing 17 blades x 8 = 136 cores currently.
  • FutureGrid project currently providing us with ~200 cores at various sites:
    • University of Chicago
    • Indiana University
    • UC San Diego
    • University of Texas - Austin
  • VMs launched using tools developed with the FutureGrid project using OpenStack technology, exploring the distributed cloud computing model.

Monitoring

Update 3/28/14

  • Running smoothly for the last week with 300+ cores

MIT DC2 3.28.14.png

  • Only running jobs for 9001 thus far:
    • ~5K jobs complete with 25K events each -> ~125M events produced in 1 week
  • May get access to ~100 more cores on FutureGrid
    • Will run jobs for 9002 and 9003 on those and/or adjust some of the nodes currently in use

Update 4/14/14

  • Some (monthly) maintenance on FutureGrid sites this past week slowed us down a bit.
  • We're up to a total of 344 cores now, running both 9001 and 9002.
  • Possibility of ~100 more next week. will run 9003 on these, or switch some of the current VMs.

MIT DC2 4.4.14.png