Difference between revisions of "MOU and Contract Status"
From GlueXWiki
Line 69: | Line 69: | ||
</table> | </table> | ||
<hr> | <hr> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* <font color="blue" size="+1">Construction Contracts.</font> | * <font color="blue" size="+1">Construction Contracts.</font> | ||
− | + | <table border="1"><tr> | |
− | + | <td width=120> University </td> | |
− | + | <td width=70> Project </td> | |
+ | <td width=70> JLab Contact </td> | ||
+ | <td width=120> Status</td> | ||
+ | </tr><tr></tr><tr> | ||
+ | <td>Carnegie Mellon University <br> C.A. Meyer</td> | ||
+ | <td>CDC</td> | ||
+ | <td>B. Zihlmann</td> | ||
+ | <td><font color="blue">Signed by CMU, At Jlab</font></td> | ||
+ | </tr><tr> | ||
+ | <td>Indiana University <br> M. Shepherd</td> | ||
+ | <td>FCAL</td> | ||
+ | <td>E. Smith</td> | ||
+ | <td><font color="green">In place, signed by all parties </font></td> | ||
+ | </tr><tr> | ||
+ | <td> University of Regina <br> G. Lolos</td> | ||
+ | <td> BCAL</td> | ||
+ | <td> E. Smith</td> | ||
+ | <td><font color="green">In place, signed by all parties.</font></td> | ||
+ | </tr> | ||
+ | <table> | ||
<hr> | <hr> | ||
* <font color="blue">Color Codes</font> | * <font color="blue">Color Codes</font> | ||
** <font color="green">Completed and signed.</font> | ** <font color="green">Completed and signed.</font> | ||
− | ** <font color=" | + | ** <font color="blue">In signature phase.</font> |
− | ** <font color=" | + | ** <font color="brown">Near to final draft.</font> |
− | ** <font color=" | + | ** <font color="orange">Initial draft stage</font> |
** <font color="red">Not started, or no work in a very long time.</font> | ** <font color="red">Not started, or no work in a very long time.</font> |
Revision as of 16:22, 4 March 2010
- MOUs between Jefferson Lab and Outside Entities.
University | Project | JLab Contact | Status |
Catholic University F. Klein |
Tagger | A. Somov | At CUA, no progress. |
Carnegie Mellon C.A. Meyer |
CDC | B. Zihlmann | signed by all parties. |
Florida International W. Boeglin |
Bridge Position | E. Smith | In signature stage, |
Florida International W. Boeglin |
Start Counter | M. Ito | To start after bridge is done. |
Florida State P. Eugenio |
TOF Wall | M. Ito | Initial draft, at JLab. |
Indiana University M. Shepherd |
FCAL | E. Smith | signed by all parties. |
North Carolina A&T A. Gasparian |
Pair Spectrometer | A. Somov | signed by all parties. |
University of Connecticut R. Jones |
Tagger | A. Somov | Not started. |
University of Massachusetts R.Miskimin |
Target | E. Smith | Near final draft, at UMass. |
University of North Carolina, Wilmington L. Gan |
Pair Spectrometer | A. Somov | signed by all parties. |
University of Regina G. Lolos |
BCAL | E. Smith | signed by all parties. |
University of Santa Maria W. Brooks |
SiPMs | E. Smith | Near to final draft, at JLab |
- Construction Contracts.
University | Project | JLab Contact | Status |
Carnegie Mellon University C.A. Meyer |
CDC | B. Zihlmann | Signed by CMU, At Jlab |
Indiana University M. Shepherd |
FCAL | E. Smith | In place, signed by all parties |
University of Regina G. Lolos |
BCAL | E. Smith | In place, signed by all parties. |