Difference between revisions of "Mar 1, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Action Items from previous meetings == # Determine if swapped bias pins was accidental or in design (Chris) # <strike> Make low voltage cables for the SiPM test (Chris) </str...")
 
(Tentative Agenda)
Line 17: Line 17:
 
# Temperature compensation (Jack)
 
# Temperature compensation (Jack)
 
# Preamp-summing (Chris is out but sent these notes)
 
# Preamp-summing (Chris is out but sent these notes)
#* The 80 U Boards will be delivered tomorrow and I have all the parts in house
 
#* I have finished and tested the last 4-Up BCAL test boards and installed it in the test fixture in 126
 
#* I installed the additional 3 power cables to power the boards
 
#* I built up 8 more of the Samtec to CAEN adapter boards and asked Jim F. to bring them to the meeting today. I am waiting on parts to finish the last 4.
 
  
 
== Minutes ==
 
== Minutes ==
 
''Attending:
 
''Attending:

Revision as of 18:23, 23 February 2012

Action Items from previous meetings

  1. Determine if swapped bias pins was accidental or in design (Chris)
  2. Make low voltage cables for the SiPM test (Chris)
  3. Acquire material to absorb water for the box (Carl)
  4. Order dew point sensor (Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
  5. Mechanical assembly (Scot)
  6. Mechanical (Jim)
  7. Mechanical drawings (Chuck)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Chris is out but sent these notes)

Minutes

Attending: