Mar 1, 2011 SiPM Electrical and Cooling
From GlueXWiki
Action Items from previous meetings
- Determine if swapped bias pins was accidental or in design (Chris)
-
Make low voltage cables for the SiPM test (Chris) -
Acquire material to absorb water for the box (Carl) -
Order dew point sensor (Jim)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris is out but sent these notes)
Minutes
Attending: Jack, Carl, Jim, Chris, Chuck, Scot, Eugene, Nick, Yi, Elton.
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris is out but sent these notes)