Mar 10

From GlueXWiki
Revision as of 10:56, 10 March 2014 by Leckey (Talk | contribs) (Created page with "FCAL Update [https://halldweb1.jlab.org/wiki/images/9/96/Update4.pdf] * ~100 channels to fix with something wrong (cable, base, pmt, etc.) DAQ * N6 optical transceivers conected...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

FCAL Update [1]

  • ~100 channels to fix with something wrong (cable, base, pmt, etc.)

DAQ

  • N6 optical transceivers conected to global trigger crate
  • Should resume regular function within the week