Difference between revisions of "Mar 13, 2012 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 29: Line 29:
 
## Construction Status
 
## Construction Status
 
## Beam tests in Hall B (John)
 
## Beam tests in Hall B (John)
##*[http://dustbunny.physics.indiana.edu/~kmoriya/note.pdf small note] on distance from CLAS scintillators by Kei
 
 
# BCAL
 
# BCAL
 
## [[BCAL Beam Tests 2012]]
 
## [[BCAL Beam Tests 2012]]
##* LG gluing schedule and LED attachment by tape
+
## [[SiPM Database]] (Yi)
 
# USM update
 
# USM update
## [https://halldweb1.jlab.org/wiki/images/f/ff/Runmanager_report_8.pdf Production Manager Report (Javiera)]
 
## [https://halldweb1.jlab.org/wiki/images/e/e1/02_28_my_pres_Hall-D.pdf Station 3: Crosstalk vs. temperature (Hayk)]
 
 
# TDR update
 
# TDR update
 
## [[Private:Instructions for the TDR | Instructions for  the TDR]] (You must be logged into the wiki to access this page).
 
## [[Private:Instructions for the TDR | Instructions for  the TDR]] (You must be logged into the wiki to access this page).
Line 41: Line 38:
 
# Simulations/Reconstruction
 
# Simulations/Reconstruction
 
# Any other business
 
# Any other business
 
[[Image:Mini-Bcal mount.png |thumb|300px| left| Mini-Bcal mount]]
 
 
<br>
 
  
 
=Minutes=
 
=Minutes=

Revision as of 08:15, 12 March 2012

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947


Items for followup from previous meeting(s)

  1. Monitoring
    • Send additional SiPMs to Athens for tests (Elton). Boards have been fabricated, but still need testing.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring
  4. Calibration of Calorimeters
  5. FCAL
    1. Construction Status
    2. Beam tests in Hall B (John)
  6. BCAL
    1. BCAL Beam Tests 2012
    2. SiPM Database (Yi)
  7. USM update
  8. TDR update
    1. Instructions for the TDR (You must be logged into the wiki to access this page).
    2. We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
  9. Simulations/Reconstruction
  10. Any other business

Minutes