Attendees:
 
Attendees:
 
# BCAL
 
## Construction
 
### All equipment operating nominally.  Builds growing within tolerances.
 
### Mod 04 to RMS today or tomorrow; Mod 05 at 50%, Mod 06 at 10%.  Two new crates arrived yesterday.
 
### Mod 02 and 03 machining most likely finished.
 
### Lead tally nearly done; some discrepancies.  Will communicate with JLab and Vulcan today.
 
### Enough epoxy for 2.5 months on hand, 9 gallons back ordered.
 
### Shipping insurance sorted out and waiting to meet with shippers and get new quotations.
 
## Fibres
 
### Shipment 8 done and 100 fibres from No. 9 (see above links). Means shifted for shipment 9, for both Npe and atten length.  Most likely a real effect but we're checking.
 
## RMS visit: March 5.
 
### Final contract will be given to RMS tomorrow.
 
### Inspection and pictures of Mod 02 and 03 machining.
 
### Transmission uniformity test on Module 01.
 

Revision as of 14:20, 17 March 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
    • Matt to coordinate with Christina on the shipment of glass blocks and pmts/dividers for monitoring system test.
  2. Fcal
    • Decision on rad hard detectors
    • Check instability of FEU-84 pmt gains / finalize number / order additional FEU-84 pmts

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
  4. FCAL
  5. BCAL
  6. Other business

Minutes

Attendees: