Difference between revisions of "Mar 19,2013 Readout"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 27: Line 27:
 
#* [https://mailman.jlab.org/pipermail/halld-cal/2013-February/000718.html e-mail] regarding decision on Fcal monitoring LEDs
 
#* [https://mailman.jlab.org/pipermail/halld-cal/2013-February/000718.html e-mail] regarding decision on Fcal monitoring LEDs
 
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2182 GlueX-doc-2182] FCAL calibration measurements with different colour LED's
 
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2182 GlueX-doc-2182] FCAL calibration measurements with different colour LED's
# Reconstruction
+
# Reconstruction and simulation
 
# Update from JLab
 
# Update from JLab
 
# Update from USM
 
# Update from USM

Revision as of 18:24, 5 March 2013

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting

Presentations from recent meetings

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring
    • e-mail regarding decision on Fcal monitoring LEDs
    • GlueX-doc-2182 FCAL calibration measurements with different colour LED's
  4. Reconstruction and simulation
  5. Update from JLab
  6. Update from USM
  7. Status of testing at Regina
  8. Beam Tests, Cosmics
  9. Other

Minutes

Attending: