Difference between revisions of "Mar 19, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Documents to Review)
Line 17: Line 17:
 
= Documents to Review=
 
= Documents to Review=
  
* View Kuraray summary of fiber performance [[Mar 5, 2009 Calorimetry]]
+
# Fiber Summaries
 +
#* [[Media:Light_output.png|Kuraray measurements of light output]] 
 +
#* [[Media:Atten.png|Kuraray measurements of attenuation length]]
  
 
= Tentative Agenda =
 
= Tentative Agenda =

Revision as of 17:25, 18 March 2009

Teleconference Time: 4:00 p.m. EST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)
  3. From stand-alone MC, or previous notes, collect the distribution of photons expected for numbers of photons for various showers (especially at low energies, e.g. 50 MeV - 200 MeV) and typicall positions (i.e angles) along the calorimeter. (Andrei).

Documents to Review

  1. Fiber Summaries

Tentative Agenda

  1. Announcements
    • USM receives major grant, which includes substantial support for Hall D hardware testing as part of the major detector lab instrumentation funding.
  2. FCAL Update
    • Note from Matt (on travel): As for progress on my end, I have 3/4 of a technical note finished on implementation of the BCAL electronics threshold in software. I hope to finish that off by next week and circulate it. You can put me on the agenda for the next calorimetry meeting to discuss both the threshold and also implementation of dark noise in the simulation.
  3. BCAL Update
    1. Preparations for construction
    2. Fiber measurements
  4. Cooling of BCAL Readout
    1. Tentative specifications
  5. Simulations
  6. Review of Action Items

Minutes