Mar 19, 2009 Calorimetry
From GlueXWiki
Revision as of 14:42, 6 March 2009 by Elton (Talk | contribs) (→Items for followup from Mar 5 meeting)
Teleconference Time: 11:00 EST/10:00 CST
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from previous meeting
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of BCAL on acceptance.
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Review options for import/export to Chile (loans, donations, transfers, etc.)
- From stand-alone MC, or previous notes, collect the distribution of photons expected for numbers of photons for various showers (especially at low energies, e.g. 50 MeV - 200 MeV) and typicall positions (i.e angles) along the calorimeter. (Andrei).
Documents to Review
Tentative Agenda
- Announcements
- FCAL Update
- Simulations
- BCAL Update
- Preparations for construction
- Fiber measurements
- BCAL Readout
- SiPMs
- FM pmts
- APDs
- Review of Action Items