Difference between revisions of "Mar 20, 2012 Readout"

From GlueXWiki
Jump to: navigation, search
(Created page with "'''<font color=red>Teleconference Time: 11:00 a.m. EST</font>''' * <font color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> * Phone c...")
 
(Tentative Agenda)
Line 40: Line 40:
 
## Manpower/shifts
 
## Manpower/shifts
 
# Update from USM
 
# Update from USM
 +
## Production Manager Report (Javiera)
 +
## Comments on lightguide Status (Iñaki
 
## [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB]
 
## [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB]
 
# Status of Testing at JLab
 
# Status of Testing at JLab

Revision as of 11:11, 20 March 2012

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting

  1. Beamtest
    • Draft a run plan (Elton and Zisis)


Presentations from recent meetings

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. BCAL Beam Tests 2012 - Check List
    1. Hall B (John)
    2. Mechanical (Tim)
    3. SiPMs/LGs/Cooling (Elton, Fernando, Scott)
    4. Monitoring: LEDs+boards+controller (Christina)
    5. Test full Mini Cal with cosmics
    6. LV, HV, VXS, Flash ADC, F1TDC, Discriminators, NIM, Trigger (Sascha)
    7. Online Coda/Analyzer / Data to disk/tape (Sascha)
    8. Logbook, e-log
    9. Run plan (Elton, Zisis)
    10. Simulations (Andrei, Irina)
    11. Manpower/shifts
  4. Update from USM
    1. Production Manager Report (Javiera)
    2. Comments on lightguide Status (Iñaki
    3. USM Web Interface to DB
  5. Status of Testing at JLab
    1. Hall-D ELOG
  6. Other

Minutes

Attending: