Mar 24, 2011 Calibration/Monitoring

From GlueXWiki
Revision as of 13:35, 24 March 2011 by Elton (Talk | contribs)

Jump to: navigation, search

Teleconference Time 11:00 EDT

  • Connection: ESNET

Background information

Action Items

  1. Can George calculate the % deviation from linearity on his plot?
  2. Christina will probe Kapos for cabling and other board issues.

Tentative Agenda

  1. Communications
    1. Summary of CAN protocol for Fcal bases (Paul)
    2. Comments on Hall D slow controls (Elliott/Hovanes)
  2. Points for Discussion (Elton)
  3. Updates from Athens (Christina)

Minutes

Attending: Christina, George, George Lolos, Kappos, Stigaris (Athens); Matt, Paul (IU); Elton, Beni, Eugene, Hovanes, Elliott, Dave (JLab);

  1. Communications
    1. Summary of CAN protocol for Fcal bases (Paul)
    2. Comments on Hall D slow controls (Elliott/Hovanes)
  2. Points for Discussion (Elton)
  3. Updates from Athens (Christina)

Attendees: