Difference between revisions of "Mar 26, 2013 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 38: Line 38:
 
=Minutes=
 
=Minutes=
  
''Attendees:
+
''Attendees:Elton, Tim, Yi, David, Beni (JLab); Kei, Matt (IU); Zisis, Andrei (UofR); Will, Hayk, Alam, Elias (USM); Christina, Stratos, Pavlos (Athens)
 +
 
 +
# Announcements
 +
# Action Items
 +
# Monitoring
 +
#* Almost all material in hand
 +
#* LEDs have not yet arrived. (Note: Zisis said that they were shipped 8 days ago and expect arrival in a few days)
 +
#* Boards will start soon and be tested for functionality. Athens will check pulse sizes relative to requirement.
 +
#* Stratos will work on the plexiglass specs. Once testing is completed, a piece of the prototype in Athens will be shipped to JLab as a sample.
 +
# FCAL
 +
# BCAL
 +
## USM Report [[FILE:20130326.pdf]]
 +
##* All measurements have been completed at USM. The next-to-last box (640 sensors) should have arrived yesterday at JLab. The last shipment (370 sensors) was sent out yesterday.
 +
##* The 3 non-conforming sensors will be shipped to JLab. Jlab will return them to Hamamatsu for replacement.
 +
##* Final testing on the forty original sensors on loan to USM (from the first article) will be completed in the next week and they should be shipped back in about a week. They will make linearity measurements on these sensors.
 +
## SiPM Measurements at Regina
 +
##*
 +
# Reconstruction and Simulation
 +
# TDR update
 +
# Calibration of Calorimeters
 +
# Any other business

Revision as of 14:57, 26 March 2013

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting(s)

  1. Monitoring
    • Supply a draft specification for preparing the surfaces of the FCAL plexiglass sheet (Athens)
  2. SiPM
    • After summary of SiPM parameters, provide data to Hamamatsu for comments (USM)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Monitoring
  4. FCAL
  5. BCAL
    1. USM Report File:20130326.pdf
    2. SiPM Measurements at Regina
  6. Reconstruction and Simulation
  7. TDR update
  8. Calibration of Calorimeters
  9. Any other business

Minutes

Attendees:Elton, Tim, Yi, David, Beni (JLab); Kei, Matt (IU); Zisis, Andrei (UofR); Will, Hayk, Alam, Elias (USM); Christina, Stratos, Pavlos (Athens)

  1. Announcements
  2. Action Items
  3. Monitoring
    • Almost all material in hand
    • LEDs have not yet arrived. (Note: Zisis said that they were shipped 8 days ago and expect arrival in a few days)
    • Boards will start soon and be tested for functionality. Athens will check pulse sizes relative to requirement.
    • Stratos will work on the plexiglass specs. Once testing is completed, a piece of the prototype in Athens will be shipped to JLab as a sample.
  4. FCAL
  5. BCAL
    1. USM Report File:20130326.pdf
      • All measurements have been completed at USM. The next-to-last box (640 sensors) should have arrived yesterday at JLab. The last shipment (370 sensors) was sent out yesterday.
      • The 3 non-conforming sensors will be shipped to JLab. Jlab will return them to Hamamatsu for replacement.
      • Final testing on the forty original sensors on loan to USM (from the first article) will be completed in the next week and they should be shipped back in about a week. They will make linearity measurements on these sensors.
    2. SiPM Measurements at Regina
  6. Reconstruction and Simulation
  7. TDR update
  8. Calibration of Calorimeters
  9. Any other business