Difference between revisions of "Mar 27, 2012 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 30: Line 30:
 
# USM update
 
# USM update
 
## Production manager update (Javiera)
 
## Production manager update (Javiera)
## Station 3 temperature measurements (Orlando)
+
## [Station 3 temperature measurements (Orlando) https://halldweb1.jlab.org/wiki/images/b/b3/Temperature_Orlando.pdf]
 
## Station 3 data analysis (Hayk)
 
## Station 3 data analysis (Hayk)
 
# TDR update
 
# TDR update

Revision as of 11:11, 27 March 2012

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947


Items for followup from previous meeting(s)

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring
  4. Cable Labels
  5. FCAL
    1. Construction Status
    2. 2011 Hall B FCAL Beam Test (John)
  6. BCAL
    1. BCAL Beam Tests 2012
  7. USM update
    1. Production manager update (Javiera)
    2. [Station 3 temperature measurements (Orlando) https://halldweb1.jlab.org/wiki/images/b/b3/Temperature_Orlando.pdf]
    3. Station 3 data analysis (Hayk)
  8. TDR update
    1. Instructions for the TDR (You must be logged into the wiki to access this page).
    2. We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
    3. Calibration of Calorimeters
  9. Simulations/Reconstruction
  10. Any other business

Minutes