Difference between revisions of "Mar 3, 2011 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Tentative Agenda)
Line 28: Line 28:
 
## Construction Status: builds, fibre QA
 
## Construction Status: builds, fibre QA
 
# Simulations
 
# Simulations
## Readout segmentation (summing, towers vs quadrants/blocks)
+
## Readout segmentation  
## Reconstruction: [http://www.jlab.org/~semenov/meeting110217.pdf Study of Segmentation with BCal Reconstruction Code]
+
 
# Other Updates
 
# Other Updates
 
<hr>
 
Splitoffs discussion:
 
 
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1499 slides] (from May 2010 collab. meeting)
 
  
 
=Minutes=
 
=Minutes=
 
''Attending:
 
''Attending:

Revision as of 15:10, 17 February 2011

Teleconference Time: 10:30 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337
  • Regina Phone: in LB228 is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
    • Zisis will gather Andrei's tests and overall ideas for BCAL monitoring system.
    • Fcal: check cross talk of calibration inputs across modules.
  2. Fcal construction
    • Mechanical: Tim has promised review of support structure.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL
    1. Construction Status: mechanical, bases
  5. BCAL
    1. Construction Status: builds, fibre QA
  6. Simulations
    1. Readout segmentation
  7. Other Updates

Minutes

Attending: