Difference between revisions of "Mar 3, 2011 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 13: | Line 13: | ||
=Items for followup from previous meeting(s)= | =Items for followup from previous meeting(s)= | ||
# Monitoring | # Monitoring | ||
− | #* Zisis will gather Andrei's tests and overall ideas for BCAL monitoring system. | + | #* <strike> Zisis will gather Andrei's tests and overall ideas for BCAL monitoring system. </strike> |
#* Fcal: check cross talk of calibration inputs across modules. | #* Fcal: check cross talk of calibration inputs across modules. | ||
− | #* Develop drawings of Fcal with the plexiglass sheet as a reference to develop further details. | + | #* <strike> Develop drawings of Fcal with the plexiglass sheet as a reference to develop further details. </strike> |
# Fcal construction | # Fcal construction | ||
− | #* Mechanical: Tim has promised review of support structure. | + | #* <strike> Mechanical: Tim has promised review of support structure. </strike> Wayne Sachleben has started the review |
#* JLab to provide shipping guidelines to Matt | #* JLab to provide shipping guidelines to Matt | ||
Line 35: | Line 35: | ||
=Minutes= | =Minutes= | ||
''Attending: | ''Attending: | ||
+ | |||
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | # Calibration | ||
+ | # BCAL | ||
+ | ## Construction Status: builds, fibre QA | ||
+ | # Simulations | ||
+ | ## Readout segmentation (Andrei) | ||
+ | # FCAL | ||
+ | ## Construction Status: mechanical, bases [http://dustbunny.physics.indiana.edu/~jomfrye/ IU FCAL struct dwgs] | ||
+ | ## Drawings for Fcal structure (Tim)[http://www.jlab.org/~whitey/FCAL Sketches for comments on FCAL structure] |
Revision as of 15:01, 3 March 2011
Teleconference Time: 10:30 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337
- Regina Phone: in LB228 is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
-
Zisis will gather Andrei's tests and overall ideas for BCAL monitoring system. - Fcal: check cross talk of calibration inputs across modules.
-
Develop drawings of Fcal with the plexiglass sheet as a reference to develop further details.
-
- Fcal construction
-
Mechanical: Tim has promised review of support structure.Wayne Sachleben has started the review - JLab to provide shipping guidelines to Matt
-
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration
- BCAL
- Construction Status: builds, fibre QA
- Simulations
- Readout segmentation (Andrei)
- FCAL
- Construction Status: mechanical, bases IU FCAL struct dwgs
- Drawings for Fcal structure (Tim)Sketches for comments on FCAL structure
Minutes
Attending:
- Announcements
- Review of Action Items
- Calibration
- BCAL
- Construction Status: builds, fibre QA
- Simulations
- Readout segmentation (Andrei)
- FCAL
- Construction Status: mechanical, bases IU FCAL struct dwgs
- Drawings for Fcal structure (Tim)Sketches for comments on FCAL structure