Difference between revisions of "Mar 4, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Items for followup from previous meeting(s))
Line 12: Line 12:
 
=Items for followup from previous meeting(s)=
 
=Items for followup from previous meeting(s)=
 
# Calibration/Monitoring
 
# Calibration/Monitoring
#* Geometry for inputing monitoring sources into Bcal
+
#* Geometry for inputing monitoring sources into Bcal ([[Media:mom_gamma_log.png]])
 
# Fcal
 
# Fcal
 
#* Specify the number of Rad Hard blocks to writeup a change request to the project.
 
#* Specify the number of Rad Hard blocks to writeup a change request to the project.

Revision as of 11:15, 4 March 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Calibration/Monitoring
  2. Fcal
    • Specify the number of Rad Hard blocks to writeup a change request to the project.
    • Investigate mechanical issues associated with supporting lead glass on top of shashlyk modules (Lubomir, Serguei). Will to send drawings of the modules.
  3. Bcal
    • Specify the normalization and dynamic range for the number of photons/GeV in showers
    • Decide on specific grouping for SiPM sums
    • Possibility of using air gap for SiPM coupling
    • Finalize shapes of "Winston guides"
  4. Simulations:
    • List of energies and angles to be simulated for the purpose of establishing the dynamic range of light to the SiPMs.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
    • Light sources in Bcal
  4. FCAL
    1. Radiation Damage Inserts
      • Shashlyk option
    2. Procurement Contract
    3. Update on FEU-84-3 PMTs
  5. BCAL
    1. Construction Status
    2. Fibre tests Media:Shipments8and9plots.pdf
  6. BCAL Readout
    1. Simulations
    2. SiPMs
    3. Geometry for guides, sensors, cooling and cables
    4. Update on USM MOU
  7. Other business

Minutes

Attendees: