Difference between revisions of "Mar 4, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 41: Line 41:
 
##* EVMS reporting and project schedule
 
##* EVMS reporting and project schedule
 
##* Scheduling the [[Fcal Fabrication Readiness Review]]
 
##* Scheduling the [[Fcal Fabrication Readiness Review]]
## Update on FEU-84-3 PMTs [[media:Feu_pmt_melz.pdf]]
+
## Update on FEU-84-3 PMTs [[media:Feu_pmt_melz.pdf slides]]
 
# BCAL
 
# BCAL
 
## Construction Status
 
## Construction Status

Revision as of 11:54, 4 March 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Calibration/Monitoring
  2. Fcal
    • Specify the number of Rad Hard blocks to writeup a change request to the project.
    • Investigate mechanical issues associated with supporting lead glass on top of shashlyk modules (Lubomir, Serguei). Will to send drawings of the modules.
  3. Bcal
    • Specify the normalization and dynamic range for the number of photons/GeV in showers
    • Decide on specific grouping for SiPM sums
    • Possibility of using air gap for SiPM coupling
    • Finalize shapes of "Winston guides"
  4. Simulations:
    • List of energies and angles to be simulated for the purpose of establishing the dynamic range of light to the SiPMs.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
    1. Light sources in Bcal
    2. Project schedule
      • FCAL activity Fab monitoring system 15222080 (delayed by a year in Oct)
      • BCAL activity Proc aux equipment incl. calibration 15221055
  4. FCAL
    1. Radiation Damage Inserts
      • Shashlyk option
    2. Procurement Contract
    3. Update on FEU-84-3 PMTs media:Feu_pmt_melz.pdf slides
  5. BCAL
    1. Construction Status
    2. Fibre tests Media:Shipments8and9plots.pdf
  6. BCAL Readout
    1. Simulations
    2. SiPMs
    3. Geometry for guides, sensors, cooling and cables
    4. Update on USM MOU
  7. Other business

Minutes

Attendees: