Difference between revisions of "Mar 5, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 23: Line 23:
 
# Simulations  
 
# Simulations  
 
# BCAL Update
 
# BCAL Update
## Bcal construction
+
## Preparations for construction
 +
## Fiber measurements (Beni)
 
# BCAL Readout
 
# BCAL Readout
## APD option
+
## SiPM and cooling [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1214 GlueX-doc-1214](Elton)
 +
## FM pmts (USM?)
 +
## APD option (Eugene)
 
# Review of Action Items
 
# Review of Action Items
  
 
=Minutes=
 
=Minutes=

Revision as of 17:48, 4 March 2009

Teleconference Time: 11:00 EST/10:00 CST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from Feb 19 meeting

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)

Documents to Review

Tentative Agenda

  1. Announcements
  2. FCAL Update
  3. Simulations
  4. BCAL Update
    1. Preparations for construction
    2. Fiber measurements (Beni)
  5. BCAL Readout
    1. SiPM and cooling GlueX-doc-1214(Elton)
    2. FM pmts (USM?)
    3. APD option (Eugene)
  6. Review of Action Items

Minutes