Difference between revisions of "Mar 5, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Tentative Agenda)
Line 35: Line 35:
 
## SiPM and cooling [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1214 GlueX-doc-1214](Elton)
 
## SiPM and cooling [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1214 GlueX-doc-1214](Elton)
 
## FM pmts (USM?)
 
## FM pmts (USM?)
## APD option (See [http://arxiv.org/pdf/0709.4514 An improved Shashlyk calorimeter] and [http://arxiv.org/pdf/physics/0310047 Development of Shashlyk calorimeter for KOPIO])(Eugene)
+
## APD option (Eugene)
 
# Review of Action Items
 
# Review of Action Items
  
 
=Minutes=
 
=Minutes=

Revision as of 09:09, 5 March 2009

Teleconference Time: 11:00 EST/10:00 CST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from Feb 19 meeting

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)

Documents to Review

See Kuraray measurements of reference fibers:

  1. Kuraray measurements of light output
  2. Kuraray measurements of attenuation length
  3. An improved Shashlyk calorimeter
  4. Development of Shashlyk calorimeter for KOPIO

Tentative Agenda

  1. Announcements
  2. FCAL Update
  3. Simulations
  4. BCAL Update
    1. Preparations for construction
    2. Fiber measurements (Beni)
    3. Acceptance date for fibers (fiber arrival at JLab on Feb 13).
  5. BCAL Readout
    1. SiPM and cooling GlueX-doc-1214(Elton)
    2. FM pmts (USM?)
    3. APD option (Eugene)
  6. Review of Action Items

Minutes