Difference between revisions of "Mar 5, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 41: Line 41:
  
 
=Minutes=
 
=Minutes=
 +
 +
# Announcements
 +
# FCAL Update
 +
## MOU
 +
## rad-hard glass insert
 +
## magnetic shield tests ([[Media:Feu84-3 field sensitivity.pdf |Field Sensitivity Plots]])
 +
# Simulations
 +
# BCAL Update
 +
## Preparations for construction
 +
## Fiber measurements (Beni) [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1225 GlueX Doc 1225]
 +
## Acceptance date for fibers (fiber arrival at JLab on Feb 13).
 +
# BCAL Readout
 +
## SiPM and cooling [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1214 GlueX-doc-1214](Elton)
 +
## FM pmts (USM?)
 +
## APD option (Eugene)
 +
# Review of Action Items

Revision as of 11:07, 6 March 2009

Teleconference Time: 11:00 EST/10:00 CST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from Feb 19 meeting

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)

Documents to Review

  1. Fibers
  2. APDs

Tentative Agenda

  1. Announcements
  2. FCAL Update
    1. MOU
    2. rad-hard glass insert
    3. magnetic shield tests (Field Sensitivity Plots)
  3. Simulations
  4. BCAL Update
    1. Preparations for construction
    2. Fiber measurements (Beni) GlueX Doc 1225
    3. Acceptance date for fibers (fiber arrival at JLab on Feb 13).
  5. BCAL Readout
    1. SiPM and cooling GlueX-doc-1214(Elton)
    2. FM pmts (USM?)
    3. APD option (Eugene)
  6. Review of Action Items

Minutes

  1. Announcements
  2. FCAL Update
    1. MOU
    2. rad-hard glass insert
    3. magnetic shield tests (Field Sensitivity Plots)
  3. Simulations
  4. BCAL Update
    1. Preparations for construction
    2. Fiber measurements (Beni) GlueX Doc 1225
    3. Acceptance date for fibers (fiber arrival at JLab on Feb 13).
  5. BCAL Readout
    1. SiPM and cooling GlueX-doc-1214(Elton)
    2. FM pmts (USM?)
    3. APD option (Eugene)
  6. Review of Action Items