''Attending:
+
''Attending:Elton, Yi, Eugene, John L., Beni, Tim, Sasha (JLab); Will,, Hayk, Javiera, Sergei, Orlando (USM); Zisis, George, Andrei, Mehrnoosh UofR); Christina, George, Pavlos (Athens).
  
 
# Announcements
 
# Announcements
 
# Review of Action Items
 
# Review of Action Items
 +
# Monitoring
 +
#* Four SiPMs are being prepared for shipment (new rules require DOE approval)
 +
#* Tracking indicates that LED boards have arrived at JLab.
 +
#* Discussion about attaching LEDs into light guides so that they could be removed and returned to Athens for additional testing.
 +
#* JLab will see how they fit on light guides and options for mounting and communicate offline.
 +
#* Christina: Need to check pitch and flexibility of cable connecting boards. Jlab will provide feedback soon.
 
# [[BCAL Beam Tests 2012]] - Check List
 
# [[BCAL Beam Tests 2012]] - Check List
 
## Hall B (John)
 
## Hall B (John)
 +
##* Elton and John have installed a fourth "remote" scintillator at approximately the 45% position
 
## Mechanical (Tim)
 
## Mechanical (Tim)
 +
##* Brackets are being machined
 
## SiPMs/LGs/Cooling (Elton, Fernando, Scott)
 
## SiPMs/LGs/Cooling (Elton, Fernando, Scott)
 +
##* 80 SiPMs have been selected and are being readied for installation. They correspond to 8 voltage groups. Each SiPM has unique jumpers to span the range of sensors from Hamamatsu
 +
##* Testing has not started yet. There is some ringing in the preamp boards. Fernando is investigating. Could be due to mismatches in impedance and or grounding problems.
 +
##* Once the ringing is fixed, the sensors should be able to be tested in a couple of days.
 
## Monitoring: LEDs+boards+controller (Christina)
 
## Monitoring: LEDs+boards+controller (Christina)
 
## Test full Mini Cal with cosmics
 
## Test full Mini Cal with cosmics
Line 63: Line 74:
 
## Logbook, e-log
 
## Logbook, e-log
 
## Run plan (Elton, Zisis)
 
## Run plan (Elton, Zisis)
 +
##* John will coordinate schedules with other groups from Halls A and B.
 +
##* The present goal is to install the mini-Bcal on Wed Mar 21, but could be a week later.
 
## Simulations (Andrei, Irina)
 
## Simulations (Andrei, Irina)
 
## Manpower/shifts
 
## Manpower/shifts
 +
##* Zisis: Regina will have undergraduates that can help out with testing modules this summer.
 
# Update from USM
 
# Update from USM
 
## [https://halldweb1.jlab.org/wiki/images/f/f7/Report_9.pdf Production Manager Report (Javiera)]
 
## [https://halldweb1.jlab.org/wiki/images/f/f7/Report_9.pdf Production Manager Report (Javiera)]

Revision as of 14:04, 6 March 2012

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting

  1. Beamtest
    • Investigate if Hall B chiller is available for our use (Elton) Chiller will be used for the HPS beamtest.
    • Draft a run plan (Elton and Zisis)
    • Consider optimum configuration for 40 Bcal LED boards on mini-Bcal (Zisis, Elton, Christina): centre two columns on each side

Presentations from recent meetings

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. BCAL Beam Tests 2012 - Check List
    1. Hall B (John)
    2. Mechanical (Tim)
    3. SiPMs/LGs/Cooling (Elton, Fernando, Scott)
    4. Monitoring: LEDs+boards+controller (Christina)
    5. Test full Mini Cal with cosmics
    6. LV, HV, VXS, Flash ADC, F1TDC, Discriminators, NIM, Trigger (Sascha)
    7. Online Coda/Analyzer / Data to disk/tape (Sascha)
    8. Logbook, e-log
    9. Run plan (Elton, Zisis)
    10. Simulations (Andrei, Irina)
    11. Manpower/shifts
  4. Update from USM
    1. Production Manager Report (Javiera)
    2. USM Web Interface to DB
    3. Light guide arrival
  5. Status of Testing at JLab
    1. Hall-D ELOG
  6. Other

Minutes

Attending:Elton, Yi, Eugene, John L., Beni, Tim, Sasha (JLab); Will,, Hayk, Javiera, Sergei, Orlando (USM); Zisis, George, Andrei, Mehrnoosh UofR); Christina, George, Pavlos (Athens).

  1. Announcements
  2. Review of Action Items
  3. Monitoring
    • Four SiPMs are being prepared for shipment (new rules require DOE approval)
    • Tracking indicates that LED boards have arrived at JLab.
    • Discussion about attaching LEDs into light guides so that they could be removed and returned to Athens for additional testing.
    • JLab will see how they fit on light guides and options for mounting and communicate offline.
    • Christina: Need to check pitch and flexibility of cable connecting boards. Jlab will provide feedback soon.
  4. BCAL Beam Tests 2012 - Check List
    1. Hall B (John)
      • Elton and John have installed a fourth "remote" scintillator at approximately the 45% position
    2. Mechanical (Tim)
      • Brackets are being machined
    3. SiPMs/LGs/Cooling (Elton, Fernando, Scott)
      • 80 SiPMs have been selected and are being readied for installation. They correspond to 8 voltage groups. Each SiPM has unique jumpers to span the range of sensors from Hamamatsu
      • Testing has not started yet. There is some ringing in the preamp boards. Fernando is investigating. Could be due to mismatches in impedance and or grounding problems.
      • Once the ringing is fixed, the sensors should be able to be tested in a couple of days.
    4. Monitoring: LEDs+boards+controller (Christina)
    5. Test full Mini Cal with cosmics
    6. LV, HV, VXS, Flash ADC, F1TDC, Discriminators, NIM, Trigger (Sascha)
    7. Online Coda/Analyzer / Data to disk/tape (Sascha)
    8. Logbook, e-log
    9. Run plan (Elton, Zisis)
      • John will coordinate schedules with other groups from Halls A and B.
      • The present goal is to install the mini-Bcal on Wed Mar 21, but could be a week later.
    10. Simulations (Andrei, Irina)
    11. Manpower/shifts
      • Zisis: Regina will have undergraduates that can help out with testing modules this summer.
  5. Update from USM
    1. Production Manager Report (Javiera)
    2. USM Web Interface to DB
    3. Light guide arrival
  6. Status of Testing at JLab
    1. Hall-D ELOG
  7. Other