Difference between revisions of "Mar 6, 2012 Readout"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting)
(Tentative Agenda)
Line 42: Line 42:
 
## Manpower/shifts
 
## Manpower/shifts
 
# Update from USM
 
# Update from USM
## [https://halldweb1.jlab.org/wiki/images/1/1e/Report_7.pdf Run manager report (Javiera)]
 
## [https://halldweb1.jlab.org/wiki/images/0/09/Brooks_update.pdf Update on 5 degree data (Will)]
 
## [https://halldweb1.jlab.org/wiki/images/c/c0/02_21_my_pres_Hall-D.pdf Discussion of dark current measurements and station 3 status (Hayk)]
 
 
## [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB]
 
## [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB]
 
## [https://mailman.jlab.org/pipermail/halld-cal/2012-February/000527.html Light guide arrival]
 
## [https://mailman.jlab.org/pipermail/halld-cal/2012-February/000527.html Light guide arrival]

Revision as of 21:02, 5 March 2012

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting

  1. Beamtest
    • Investigate if Hall B chiller is available for our use (Elton) Chiller will be used for the HPS beamtest.
    • Draft a run plan (Elton and Zisis)
    • Consider optimum configuration for 40 Bcal LED boards on mini-Bcal (Zisis, Elton, Christina)

Presentations from recent meetings

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. BCAL Beam Tests 2012 - Check List
    1. Hall B (John)
    2. Mechanical (Tim)
    3. Monitoring (Christina)
    4. SiPMs/LGs/Cooling (Elton, Fernando, Scott)
    5. LEDs+boards+controller (Christina)
    6. Test full Mini Cal with cosmics?
    7. LV, HV, VXS, Flash ADC, F1TDC, Discriminators, NIM, Trigger (Sascha)
    8. Online Coda/Analyzer / Data to disk/tape? (Sascha?)
    9. Logbook, e-log
    10. Run plan (Elton, Zisis)
    11. Simulations (Andrei, Irina)
    12. Manpower/shifts
  4. Update from USM
    1. USM Web Interface to DB
    2. Light guide arrival
  5. Status of Testing at JLab
    1. Hall-D ELOG
  6. Other

Minutes

Attending: