Difference between revisions of "March 1, 2013 Installation"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 30: Line 30:
 
# Installation Schedule (Tim)
 
# Installation Schedule (Tim)
 
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2141 CDC Installation Plan] (Curtis)
 
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2141 CDC Installation Plan] (Curtis)
# FCAL Installation Plan [Media:Fcal_assembly_schedule_v0.pdf] (Matt)
+
# FCAL Installation Plan [[Media:Fcal_assembly_schedule_v0.pdf]] (Matt)
 
# Trigger Configurations (Alex)
 
# Trigger Configurations (Alex)
  
 
== Minutes ==
 
== Minutes ==

Revision as of 14:25, 1 March 2013

Meeting Time and Place

Friday, March 1, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone (supported on request only) dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#


Up to GlueX/Hall-D Installation Meetings

Action Items From Last Meeting

  • Tim will present the overall installation schedule. We agreed this would be a standing agenda item.
  • Matt and Curtis will develop a plan and set of requirements for the FCAL and CDC respectively. We will review this at the meeting, and, if it is good, we will circulate to other detector groups to have them produce a similar list.
  • Alex will prepare slides discussing what types of trigger configurations may be available for initial commissioning.

Agenda

  1. Announcements
  2. Installation Schedule (Tim)
  3. CDC Installation Plan (Curtis)
  4. FCAL Installation Plan Media:Fcal_assembly_schedule_v0.pdf (Matt)
  5. Trigger Configurations (Alex)

Minutes