March 1, 2013 Installation

From GlueXWiki
Revision as of 15:44, 15 February 2013 by Mashephe (Talk | contribs) (Created page with "__TOC__ == Meeting Time and Place == Friday, March 1, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326 == Connections == To connect from the outside, please ...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting Time and Place

Friday, March 1, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone (supported on request only) dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#


Up to GlueX/Hall-D Installation Meetings

Action Items From Last Meeting

  • Tim will present the overall installation schedule. We agreed this would be a standing agenda item.
  • Matt and Curtis will develop a plan and set of requirements for the FDC and CDC respectively. We will review this at the meeting, and, if it is good, we will circulate to other detector groups to have them produce a similar list.
  • Alex will prepare slides discussing what types of trigger configurations may be available for initial commissioning.

Agenda

  1. Announcements
  2. Installation Schedule (Tim)
  3. CDC Installation Plan (Curtis)
  4. FCAL Installation Plan (Matt)
  5. Trigger Configurations (Alex)

Minutes